MSFAdmin

About MSFAdmin

This author has not yet filled in any details.
So far MSFAdmin has created 11 blog entries.

NHS Office Carpet Tiles South London

By |2024-04-21T11:40:35+00:00April 21st, 2024|Carpet Tiles|

At an NHS head office in South London as part of a large office refurbishment, Marcus Sheppard Flooring fitted new carpet tiles. The customer supplied the tiles they required so after removing all of the old tiles and cleaning the floor we were ready to install. We primed the floor and then glued out

Anti Slip Stair Nosings Camberwell School London

By |2024-04-21T11:10:20+00:00April 21st, 2024|Uncategorized|

At this school in Camberwell South London, Marcus Sheppard Flooring were tasked with replacing the nosings and vinyl on a main set of stairs. After removing the old vinyl and silicone we removed the old nosings. The concrete was in very bad condition and needed to be dug out before we could refill it

Office Carpet Tiles Kings Cross London

By |2024-04-20T11:22:49+00:00April 20th, 2024|Carpet Tiles|

Marcus Sheppard Flooring were asked to replace the carpet tiles in this office in Kings Cross London. Part of the floor was damaged in the middle which was unable to be repaired. After removing the old tiles and making good the area we fitted ply wood to the damaged area and then feather screeded

New Carpet Tiles NHS Kings Cross London

By |2024-04-20T10:38:19+00:00April 20th, 2024|Carpet Tiles|

At this NHS Mental Health Hospital in Kings Cross London Marcus Sheppard Flooring were contracted to replace a section of carpet tiles in the living area. The carpet tiles were in the shape of a circle surrounded by vinyl flooring. We removed the old tiles and scraped up the old glue until there was

NHS Mental Health Vinyl Flooring London

By |2024-04-20T11:32:35+00:00April 19th, 2024|Vinyl Flooring|

At this NHS Mental Health Hospital in London we were tasked with replacing the flooring in a patients bedroom. The old vinyl in the bedroom and shower room were removed along with the old cap and cove. We screeded the floor and made good so there was a nice flat surface to lay the

Go to Top