At a secondary school in Islington, London we were asked to replace the floor in one of the offices. We removed the old vinyl which lead to the old screed coming up as well. We had to dig out the old screed across the room until it was suitable to be re-screeded. This took some time but eventually we had a floor ready to be laid. After priming the floor and allowing it to dry to we glued and laid floor in sections.