MSFAdmin

About MSFAdmin

This author has not yet filled in any details.
So far MSFAdmin has created 14 blog entries.

Commercial Rubber Flooring London

By |2024-05-21T11:42:32+00:00May 21st, 2024|Rubber Flooring|

Our client based in Canary Wharf London had problems with a painted floor flaking caused by heavy trollies and pallets over a period of time. As a solution we recommended a rubber floor which would be much more durable and capable of standing heavy loads. We first spent a while grinding back the paint

Entrance Matting School West London

By |2024-05-21T11:27:59+00:00May 21st, 2024|Entrance Matting|

At this school in West London the carpet at a main doorway was being degraded by wet footfall so they wished to change it to matting.  We cut out the carpet around the door and fitted aluminium matting. The matting would provide far higher resistance against the weather and protect the carpet around it.

NHS Office Carpet Tiles South London

By |2024-04-21T11:40:35+00:00April 21st, 2024|Carpet Tiles|

At an NHS head office in South London as part of a large office refurbishment, Marcus Sheppard Flooring fitted new carpet tiles. The customer supplied the tiles they required so after removing all of the old tiles and cleaning the floor we were ready to install. We primed the floor and then glued out

Anti Slip Stair Nosings Camberwell School London

By |2024-04-21T11:10:20+00:00April 21st, 2024|Uncategorized|

At this school in Camberwell South London, Marcus Sheppard Flooring were tasked with replacing the nosings and vinyl on a main set of stairs. After removing the old vinyl and silicone we removed the old nosings. The concrete was in very bad condition and needed to be dug out before we could refill it

Office Carpet Tiles Kings Cross London

By |2024-04-20T11:22:49+00:00April 20th, 2024|Carpet Tiles|

Marcus Sheppard Flooring were asked to replace the carpet tiles in this office in Kings Cross London. Part of the floor was damaged in the middle which was unable to be repaired. After removing the old tiles and making good the area we fitted ply wood to the damaged area and then feather screeded

Go to Top